Issue - meetings

172048

Meeting: 25/06/2018 - Planning Committee (Item 14)

14 APPLICATION NO 172048- Land between Thames Valley Business Park and Napier Road ( Bulmershe and Whitegates) pdf icon PDF 341 KB

Reccommendation: Conditional approval subject to legal agreement.

Additional documents:

Minutes:

Proposal: Full application for proposed construction of a segregated fasttrack public transport, pedestrian and cycle bridge and viaduct, comprising concrete bridge structure with a river span of 59.5m and a land span of 316m, supported by concrete columns, steel beams and reinforced soil embankment, together with new footpath links and existing footpath alterations, replacement supermarket car parking provision, junction improvements and landscaping.

 

Applicant: Reading Borough Council Highways and Transport Department. 

 

The Committee received and reviewed a report about this application, set out in agenda pages 5 to 82.

 

The Committee were advised that the Members’ Update included:

 

·         an update to the report regarding tree removal from other land users;

·         clarification of alternative schemes, cables, accommodation bridge, marshland and journey time savings;

·         an additional 16 objections. 

 

Bill Luck, Earley Town Council, spoke in objection to the application. Bill stated that the design of the bridge was ‘unsightly’, and that it had not adhered to the required ‘good design’ as stated in the NPPF paragraph 17. He added that the proposed development would result in a loss to wildlife and that it would fail to protect the local biodiversity. Bill stated that flooding compensation would be provided but it would be located in woodland. Bill added that the viaduct would not be screened and at its closest point to the river it would only be 5 metres away from the bank. Bill stated that the proposed development would not retain the existing features and felt that it contravened paragraph 9 of the NPPF which stated that development should seek a positive improvement in the quality of the natural environment. Bill was of the opinion that there was no policy justification for the proposed development and asked that the Committee refuse the application on the grounds of severe impact on the setting, damage to the nearby grade II listed bridge and the flood risk that the development would propose.

 

Tamzin Morphy, Resident, spoke in objection to the application. She felt that the proposed development would ruin the visual amenity and green space provisions and would contravene local and national planning policy. Tamzin felt that the proposed development would negatively affect the most densely populated area of Reading and that less intrusive methods (of reducing traffic congestion and improving public transport services) had not been trialled Tamzin stated that the development would cost £24 million and felt that it would devastate the local wildlife population and result in at least 766 trees being felled as a result of the development (with only 77 trees to be planted as replacements). Tamzin was of the opinion that the local grass snake and slow worm populations at the proposed development site had not been accounted for and that there would be a net loss in biodiversity as a result of the proposed development. Tamzin added that traffic levels had been falling on the London Road in recent years and felt that this application (if approved) would increase the overall traffic on the London Road as a result  ...  view the full minutes text for item 14